Fixes#679
This change sets the default commit protocol for distributed DDL
commands to '1pc'. If the user issues a distributed DDL command with
this default setting, then once in a session, a NOTICE message is
shown about using '2pc' being extra safe.
We can now support richer set of queries in router planner.
This allow us to support CTEs, joins, window function, subqueries
if they are known to be executed at a single worker with a single
task (all tables are filtered down to a single shard and a single
worker contains all table shards referenced in the query).
Fixes : #501
Fixes#513
This change modifies the DDL Propagation logic so that DDL queries
are propagated via 2-Phase Commit protocol. This way, failures during
the execution of distributed DDL commands will not leave the table in
an intermediate state and the pending prepared transactions can be
commited manually.
DDL commands are not allowed inside other transaction blocks or functions.
DDL commands are performed with 2PC regardless of the value of
`citus.multi_shard_commit_protocol` parameter.
The workflow of the successful case is this:
1. Open individual connections to all shard placements and send `BEGIN`
2. Send `SELECT worker_apply_shard_ddl_command(<shardId>, <DDL Command>)`
to all connections, one by one, in a serial manner.
3. Send `PREPARE TRANSCATION <transaction_id>` to all connections.
4. Sedn `COMMIT` to all connections.
Failure cases:
- If a worker problem occurs before sending of all DDL commands is finished, then
all changes are rolled back.
- If a worker problem occurs after all DDL commands are sent but not after
`PREPARE TRANSACTION` commands are finished, then all changes are rolled back.
However, if a worker node is failed, then the prepared transactions in that worker
should be rolled back manually.
- If a worker problem occurs during `COMMIT PREPARED` statements are being sent,
then the prepared transactions on the failed workers should be commited manually.
- If master fails before the first 'PREPARE TRANSACTION' is sent, then nothing is
changed on workers.
- If master fails during `PREPARE TRANSACTION` commands are being sent, then the
prepared transactions on workers should be rolled back manually.
- If master fails during `COMMIT PREPARED` or `ROLLBACK PREPARED` commands are being
sent, then the remaining prepared transactions on the workers should be handled manually.
This change also helps with #480, since failed DDL changes no longer mark
failed placements as inactive.
Fixes#271
This change sets ShardIds and JobIds for each test case. Before this change,
when a new test that somehow increments Job or Shard IDs is added, then
the tests after the new test should be updated.
ShardID and JobID sequences are set at the beginning of each file with the
following commands:
```
ALTER SEQUENCE pg_catalog.pg_dist_shardid_seq RESTART 290000;
ALTER SEQUENCE pg_catalog.pg_dist_jobid_seq RESTART 290000;
```
ShardIds and JobIds are multiples of 10000. Exceptions are:
- multi_large_shardid: shardid and jobid sequences are set to much larger values
- multi_fdw_large_shardid: same as above
- multi_join_pruning: Causes a race condition with multi_hash_pruning since
they are run in parallel.
Fixes#302
Since our previous syntax did not allow creating hash partitioned tables,
some of the previous tests manually changed partition method to hash to
be able to test it. With this change we remove unnecessary workaround and
create hash distributed tables instead. Also in some tests metadata was
created manually. With this change we also fixed this issue.
This commit adds a fast shard pruning path for INSERTs on
hash-partitioned tables. The rationale behind this change is
that if there exists a sorted shard interval array, a single
index lookup on the array allows us to find the corresponding
shard interval. As mentioned above, we need a sorted
(wrt shardminvalue) shard interval array. Thus, this commit
updates shardIntervalArray to sortedShardIntervalArray in the
metadata cache. Then uses the low-level API that is defined in
multi_copy to handle the fast shard pruning.
The performance impact of this change is more apparent as more
shards exist for a distributed table. Previous implementation
was relying on linear search through the shard intervals. However,
this commit relies on constant lookup time on shard interval
array. Thus, the shard pruning becomes less dependent on the
shard count.
All citusdb references in
- extension, binary names
- file headers
- all configuration name prefixes
- error/warning messages
- some functions names
- regression tests
are changed to be citus.